Call to invest in the sun. Sustainable Energy Malaysia, 4 (8). pp. 24-27. ISSN 2590-4000 (2020)
Related URLs:
Abstract
Government at the end of February 2020 has announced an economic stimulus package consisting of as much as 1,400MW of solar PV will be provided. Of the 1,400MW, 1,000MW will be used for large-scale solar (LSS) projects and, which is important for rooftop installation, 300MW for domestic, commercial, industrial and agricultural sectors while 100MW for government buildings.
Item Type: | Article |
---|---|
Keywords: | Solar photovoltaic (PV), Renewable energy, Net Energy Metering (NEM), Solar energy |
Taxonomy: | By Subject > College of Engineering > Electrical Engineering > Power |
Local Content Hub: | Subjects > College of Engineering |
Depositing User: | Farleen Azrina Zamberi |
Date Deposited: | 07 Sep 2022 09:24 |
Last Modified: | 07 Sep 2022 09:24 |
Related URLs: |
Actions (login required)
View Item |