Structural assessment and strengthening of a cracked bridge pier

Structural assessment and strengthening of a cracked bridge pier. Jurnal Jabatan Kerja Raya Malaysia. pp. 51-57. (2013)



Abstract

A 2.7 km long viaduct connecting the West Port and North Port in the state of Selangor was constructed in 1997. The superstructure consisted of reinforced concrete slabs on prestressed concrete beams spanning across 28.0m. The piers were reinforced concrete with a typical crosshead beam supported on circular columns. The viaduct was completed and opened to traffic in 1999. Cracks on the crosshead beams and columns were found in several piers in 2004 and again in few
other piers in 2010.

Item Type: Article
Keywords: Construction, Crack mapping, Structural assessment, Bridge pier, Strengthening, Cracks
Taxonomy: By Subject > College of Engineering > Civil Engineering > Construction Business and Project Management
By Subject > College of Engineering > Civil Engineering > Structural and Material
Local Content Hub: Subjects > College of Engineering
Depositing User: Farleen Azrina Zamberi
Date Deposited: 12 Sep 2022 02:55
Last Modified: 12 Sep 2022 04:47
Related URLs:

Actions (login required)

View Item View Item