Value problem solving at design stage of public construction projects in malaysia. Jurnal Jabatan Kerja Raya Malaysia (1). pp. 92-99. (2013)
Abstract
Since over the past two decades, Value Management (VM) has been adopted for use as a value for money measure in construction projects of a number of countries (Kelly, Male and Graham, 2004). As stated, it has seen growth in its development and practice at differing intervention points across a wide range of construction project types. It is acknowledged that VM is highly effective in early planning stage of a project as well as during various stages of design, construction and operation. A well-managed and effective implementation of VM will result in value enhancements which are focused on meeting or even 93
surpassing client’s expectation.
Item Type: | Article |
---|---|
Keywords: | Construction projects, Design stage, Value Management (VM), VM in malaysia, Value problems, VM benefits, VM viability |
Taxonomy: | By Subject > College of Engineering > Civil Engineering > Construction Business and Project Management |
Local Content Hub: | Subjects > College of Engineering |
Depositing User: | Farleen Azrina Zamberi |
Date Deposited: | 12 Sep 2022 03:28 |
Last Modified: | 12 Sep 2022 03:28 |
Related URLs: |
Actions (login required)
View Item |