Value problem solving at design stage of public construction projects in malaysia

Value problem solving at design stage of public construction projects in malaysia. Jurnal Jabatan Kerja Raya Malaysia (1). pp. 92-99. (2013)



Abstract

Since over the past two decades, Value Management (VM) has been adopted for use as a value for money measure in construction projects of a number of countries (Kelly, Male and Graham, 2004). As stated, it has seen growth in its development and practice at differing intervention points across a wide range of construction project types. It is acknowledged that VM is highly effective in early planning stage of a project as well as during various stages of design, construction and operation. A well-managed and effective implementation of VM will result in value enhancements which are focused on meeting or even 93
surpassing client’s expectation.

Item Type: Article
Keywords: Construction projects, Design stage, Value Management (VM), VM in malaysia, Value problems, VM benefits, VM viability
Taxonomy: By Subject > College of Engineering > Civil Engineering > Construction Business and Project Management
Local Content Hub: Subjects > College of Engineering
Depositing User: Farleen Azrina Zamberi
Date Deposited: 12 Sep 2022 03:28
Last Modified: 12 Sep 2022 03:28
Related URLs:

Actions (login required)

View Item View Item