TNB aims to accelerate green agenda. [Newspaper] (2022)
Related URLs:
Abstract
Tenaga Nasional Bhd (TNB) plans to build new, cleaner power plants at existing Kapar and old Paka sites as it fast tracks its green energy blueprint announced last year to achieve net zero emissions by 2050.
Item Type: | Newspaper |
---|---|
Keywords: | Power supply, Power plant, Green energy, Grid infrastructure |
Taxonomy: | By Subject > College of Engineering > Electrical Engineering > Power |
Local Content Hub: | Subjects > College of Engineering |
Depositing User: | Idris Muhammad |
Date Deposited: | 12 Jan 2023 07:42 |
Last Modified: | 12 Jan 2023 07:42 |
Related URLs: |
Actions (login required)
View Item |