SEB to phase out Sejingkat power plant. [Newspaper] (2022)
Related URLs:
Abstract
Sarawak Energy Bhd (SEB) will phase out its 210MW Sejingkat coal-fired power plant here as it adds more renewable energy capacity, like hydro and solar, to its generation mix.
Item Type: | Newspaper |
---|---|
Keywords: | Energy, Coal-fired power plants, Power plants, Sarawak Energy |
Taxonomy: | By Subject > College of Engineering > Electrical Engineering > Power |
Local Content Hub: | Subjects > College of Engineering |
Depositing User: | Idris Muhammad |
Date Deposited: | 12 Jan 2023 09:11 |
Last Modified: | 12 Jan 2023 09:11 |
Related URLs: |
Actions (login required)
View Item |