Out with the old, in with the new: welcoming regulatory period 2

Out with the old, in with the new: welcoming regulatory period 2. Energy Malaysia, 15. pp. 6-11. ISSN 2289-7488 (2018)



Abstract

Malaysia’s energy sector is in transition, and this is best reflected in the adoption of the Incentive-Based Regulation (IBR) framework in the electricity tariff determination. Having been introduced in 2014 (Trial Period), the roll-out of IBR for Regulatory Period 1 (RP1) continues from 2015 till 2017. Halfway through 2018, Energy Malaysia takes a look at the achievements of RP1 and the aims of Regulatory Period 2.