What happens now? Energy Malaysia, 15. pp. 12-14. ISSN 2289-7488 (2018)
Related URLs:
Abstract
The industrial sector is looking forward to fully embrace the transition to further enhance the development of their respective businesses parallel to the Regulatory Period 2 (RP2).
Item Type: | Article |
---|---|
Keywords: | Energy sector, Energy supply, Power utility regulatory, Electricity infrastructure, Incentive Based Regulation (IBR) mechanism |
Taxonomy: | By Subject > College of Engineering > Electrical Engineering > Power |
Local Content Hub: | Subjects > College of Engineering |
Depositing User: | Farleen Azrina Zamberi |
Date Deposited: | 18 Oct 2022 06:59 |
Last Modified: | 18 Oct 2022 06:59 |
Related URLs: |
Actions (login required)
View Item |