What happens now? Energy Malaysia, 15. pp. 12-14. ISSN 2289-7488 (2018)



Abstract

The industrial sector is looking forward to fully embrace the transition to further enhance the development of their respective businesses parallel to the Regulatory Period 2 (RP2).

Item Type: Article
Keywords: Energy sector, Energy supply, Power utility regulatory, Electricity infrastructure, Incentive Based Regulation (IBR) mechanism