Reshaping electricity supply industry. Energy Malaysia, 14. pp. 14-15. ISSN 2289-7488 (2018)
Related URLs:
Abstract
Several sectors within the energy supply industry are undergoing a transition alongside the implementation of Regulatory Period 2 (RP2). Energy Malaysia takes a closer look at how Tenaga Nasional isgearing up for the upcoming transition within the industry.
Item Type: | Article |
---|---|
Keywords: | Energy regulator, Regulatory Period 2, Electricity, Smart grid system, Smart meters, Sustainable energy |
Taxonomy: | By Subject > College of Engineering > Electrical Engineering > Power By Subject > College of Engineering > Electrical Engineering > Systems |
Local Content Hub: | Subjects > College of Engineering |
Depositing User: | Farleen Azrina Zamberi |
Date Deposited: | 19 Oct 2022 09:42 |
Last Modified: | 19 Oct 2022 09:42 |
Related URLs: |
Actions (login required)
View Item |