Bridges built to withstand floods

Bridges built to withstand floods. [Newspaper] (2022)



Abstract

The 665km East Coast Rail Link (ECRL), a mega-rail project launched in 2017, is designed with the monsoon season and future flooding in mind.

Scheduled for completion in December 2026, the RM50 billion project will traverse Kelantan, Terengganu and Pahang to the Klang Valley. It will cut travel time between the east and west coasts from eight hours to four hours.

Item Type: Newspaper
Keywords: Elevated railway, Flood-prone
Taxonomy: By Subject > College of Engineering > Civil Engineering > Geotechnical and Transportation
Local Content Hub: Subjects > College of Engineering
Depositing User: Idris Muhammad
Date Deposited: 13 Jan 2023 03:51
Last Modified: 13 Jan 2023 03:51
Related URLs:

Actions (login required)

View Item View Item