PAAB allocates RM471 million for water treatment plant projects in Kelantan. [Newspaper] (2022)
Related URLs:
Abstract
A total of RM471 million have been allocated by the Water Management Assets Berhad (PAAB) for the construction of 10 water treatment plants in Kelantan.
Its chairman Datuk Dr Mohd Khairuddin Aman Razali said the water treatment plants would be built in Semerak, Pasir Putih and scheduled to complete by 2026.
Item Type: | Newspaper |
---|---|
Keywords: | Water treatment plants, Expertise |
Taxonomy: | By Subject > College of Engineering > Chemical Engineering > Separation Technology |
Local Content Hub: | Subjects > College of Engineering |
Depositing User: | Idris Muhammad |
Date Deposited: | 13 Jan 2023 08:47 |
Last Modified: | 13 Jan 2023 08:47 |
Related URLs: |
Actions (login required)
View Item |